Site Survey

Avoid surprises before fabrication or install. Know what fits what is safe and what approvals are required.
Deliverables
What's included
Measured diagrams

Measurements that prevent rework later.

Photo set

A ready‑to‑use deliverable that moves the work forward.

Survey report

Site facts upfront so production fits first time.

Timeline & Milestone
Stay in the Loop

1

Survey setup

Collect address, scope, and safety rules.

2

Survey scope

Confirm survey areas and outputs.

3

Site visit and capture

Visit site. Capture photos, measurements, constraints.

4

Findings aligned

Align findings and next steps.

5

Survey report draft

Draft survey report and placement options.

6

Report review

Review together. Note missing details.

7

Updates applied

Update drawings and notes.

8

Survey pack approval

Approve the final survey pack.

9

Pack delivered

Deliver pack with photos and dims.

10

Install support

Remain available for install questions.

Timeline & Milestone
Got Questions? We got answers
What is the standard timeline and which steps drive it?

Steps: Kickoff and asset collection, Scope confirmed, Build full draft, Review session, Final review. Longest lead: Research tools, testing panels (if used), printing (if any)..

What is included vs. out of scope by default?

Included: Senior task exports, Complex build files. Out: Third‑party costs and extras not in the agreed scope.

How many review rounds are included and how are changes handled?

2 approval gates: Review session, Final review. Changes after a gate = scope change.

What formats will we receive at handover?

Finals supplied in standard editable/ready‑to‑use formats per deliverable.

What dependencies or third‑party costs should we plan for?

Research tools, testing panels (if used), printing (if any).

What are the acceptance criteria before final sign‑off?

Files match spec; color/type per guide; decision log signed.

Do you offer a rush option and what does it change?

Available on request; surcharge applies. Internal steps compress; external lead times do not.

How do you measure success for this deliverable?

Adoption/usage of asset, consistency audit pass‑rate, reduced decision latency.

Site Survey

Contact Us

Skip the Form. Message us to Fast-track Your Booking

We’ll right-size the hours, align on deliverables, and handle checkout for you.

0

Your Product Basket

Quantity: 0 Items: 0
The Cart is Empty
No Product in the Cart!
$0.00
$0.00
$0.00
Best Travel Theme

Elementor Demos

With Love Travel WordPress Theme you will have everything you need to create a memorable online presence. Start create your dream travel site today.

Discover the World, one Full Adventure at a Time!

Our Contacts

Address

1080 Brickell Ave - Miami

United States of America

Email

info@travel.com

Phone

Travel Agency +1 473 483 384

Info Insurance +1 395 393 595

Follow us